Utility-scale storage hardware and the dispatch software that decides when it earns — from interconnection to first revenue in 14 months.

Home

We build grid-scale storage. We also run it.

Containerized LFP storage and bidirectional power conversion, engineered as a single certified unit and built for twenty-year assets.

Deployed on a twelve to sixteen month schedule and dispatched from day one on our own software, with fleet availability published every year.

POWERING THE GRID FOR OPERATORS ACROSS NORTH AMERICA

What We Do

We build, deploy, and run grid-scale battery storage — one team from the interconnection study through to the megawatt-hours a site bids each morning.

Our Story
Our Solutions

Owning the hardware and the dispatch software means the asset that gets built is the asset that gets bid — no seam between what is installed and what earns.

Owning the hardware and the dispatch software means the asset that gets built is the asset that gets bid — no seam between what is installed and what earns.

Our Solutions

01

Systems

Systems

Battery storage hardware, built for twenty-year assets.

CAPABILITIES:

LFP Storage

Bidirectional PCS

UL 9540A Enclosure

Containerized LFP and bidirectional power conversion, tested at the enclosure rather than the cell — so what you certify is what you operate.

Explore Systems

02

Deployment

Deployment

Three ways to work with us: complete storage systems, deployment from site survey to energization, and the software that runs the fleet.

CAPABILITIES:

Engineering & Studies

Installation

Commissioning

We carry the project from interconnection study through energization, which is how first revenue lands in fourteen months.

Explore Deployment

03

Software

Software

Monitoring and performance across every site.

CAPABILITIES:

Site Monitoring

Performance

State of Health

Forecasts price, bids into day-ahead and real-time, and tracks degradation block by block. Runs on our hardware or yours.

Explore Software

Global Footprint

Where We Operate

Operating site
Bell Junction
West Texas · ERCOT
Standalone storage dispatching into ERCOT West. Containerized LFP, energized and operated by Anode from first dispatch.
Operating siteOfficeIn development
01/09

Selected Work

Featured Projects

01/01
Bell Junction
[2025]
Bell Junction
[MW]
120
[MWH]
480
[MONTHS]
13
Hybrid site pairing existing generation with storage under a single point of interconnection.
Cedar Bayou
[2026]
Cedar Bayou
[MW]
200
[MWH]
800
[MONTHS]
14
Four-hour storage co-located with an existing solar interconnect, bid into ERCOT day-ahead from month one.
Marfa Flats
[2025]
Marfa Flats
[MW]
150
[MWH]
600
[MONTHS]
16
Standalone storage on a constrained node, cycling twice daily against congestion.
Salt Fork
[2024]
Salt Fork
[MW]
90
[MWH]
360
[MONTHS]
15
First fleet site to complete a full augmentation cycle with no measured capacity shortfall.
What our partners say
Anode took Cedar Bayou from interconnection study to first dispatch in fourteen months, and the enclosure we certified is the enclosure we operate.
Dana Whitfield
VP Development at Cedar Bayou Partners

Ready to build?

Start a Project

Create a free website with Framer, the website builder loved by startups, designers and agencies.