From empty pad to energized asset.

We turn a signed interconnection agreement into an operating asset, and we own every step in between.

Twelve to sixteen months from notice to proceed through energization on a standard site. Interconnection position and permitting are the variables; everything downstream we control.

Start a Project

What We Handle

One team, one contract, one schedule.

Most projects stall in the handoffs, between the equipment vendor, the EPC, and whoever ends up owning the interconnection paperwork.

We take the whole scope, so there is one schedule to track and one number to call when something moves.

Site survey

Grid connection, geotechnical conditions, access, setbacks, and available land. A configuration and a schedule before anything is committed.

Engineering

Civil, electrical, and controls design. Drawing set, interconnection application support, and permitting documentation with the AHJ.

Installation

Foundations, equipment placement, cabling, and integration with existing site infrastructure, managed to one schedule.

Commissioning

Factory and site acceptance testing, energization, and operator training, with the documentation your operator and insurer need.

Handover

As-built drawings, acceptance test results, warranty activation, and a commissioning report with a performance baseline.

Service

Scheduled maintenance, health assessments, remote diagnostics, and field response through the warranty term.

FAQ

Common questions.

What is included in the quoted price?

Equipment, installation, commissioning, operator training, and the documentation package. Scope outside the pad is quoted separately.

Do you handle the interconnection application?

Yes. We prepare and support the application and studies through energization, and permitting documentation stays with us, not with a third party.

Can you install equipment we bought elsewhere?

Case by case. We review third party equipment for compatibility before committing to a schedule.

What happens if the schedule slips on our side?

We rebaseline together. Crews and equipment are resequenced, not cancelled.