Projects

Built, energized, and dispatching.

Every project on this page is a site we engineered, installed, and now operate, with capacity, energy, and schedule shown as built.

From Gulf Coast load centers to West Texas congestion, each site was picked for the revenue it can actually clear, and each one runs on Anode software from its first commercial cycle.

Bell Junction
[2025]
Bell Junction
[MW]
120
[MWH]
480
[MONTHS]
13
Hybrid site pairing existing generation with storage under a single point of interconnection.
Bell Junction
[2025]
Bell Junction
[MW]
120
[MWH]
480
[MONTHS]
13
Hybrid site pairing existing generation with storage under a single point of interconnection.
Cedar Bayou
[2026]
Cedar Bayou
[MW]
200
[MWH]
800
[MONTHS]
14
Four-hour storage co-located with an existing solar interconnect, bid into ERCOT day-ahead from month one.
Cedar Bayou
[2026]
Cedar Bayou
[MW]
200
[MWH]
800
[MONTHS]
14
Four-hour storage co-located with an existing solar interconnect, bid into ERCOT day-ahead from month one.
Marfa Flats
[2025]
Marfa Flats
[MW]
150
[MWH]
600
[MONTHS]
16
Standalone storage on a constrained node, cycling twice daily against congestion.
Marfa Flats
[2025]
Marfa Flats
[MW]
150
[MWH]
600
[MONTHS]
16
Standalone storage on a constrained node, cycling twice daily against congestion.
Salt Fork
[2024]
Salt Fork
[MW]
90
[MWH]
360
[MONTHS]
15
First fleet site to complete a full augmentation cycle with no measured capacity shortfall.
Salt Fork
[2024]
Salt Fork
[MW]
90
[MWH]
360
[MONTHS]
15
First fleet site to complete a full augmentation cycle with no measured capacity shortfall.